Moranbah Airport, Queensland, Australia
Projects: Engineering - Planning & Design | Construction | Operations WSO/ARO
PROJECT SUMMARY
ACG was requested to assist the ACG Construction Team in delivering the Taxiway widening and Runway Side Drains at Moranbah Airport.
Project Capital Cost: $3.2m AUD
ROLE
WSO/ARO
PROJECT CHALLENGES AND OUTCOMES
ACG was heavily involved in the project role assisting the construction team in ensuring the Runway was back in service and compliant after every night shift. ACG was required to complete a runway inspection with the Moranbah Airport duty team and sign off as compliant before the Runway was handed back to the Airport for daily flights.
ROLES MATRIX
Member: Ross Issaacson – WSO
Roles: BMA Liaison, Construction Support & NOTAM and MOWP Assistant
Member: Hayden Wicks – WSO
Roles: BMA Liaison, Construction Support & NOTAM and MOWP Assistant
2017
Moranbah Airport Taxiway Widening, Runway Side Drains - BMA
References
Crispian Mallise
Project Manager - BMA
M: +61 427 139 278