Brisbane Airport, Queensland, Australia

PROJECT SUMMARY

ACG was engaged by the concrete placement contractor to ensure that the finished product exceeded the minimum standards set out in the specifications.

SCOPE OF WORKS
  • Planning of concrete construction works
  • On-site technical support during construction
  • Construction quality reviews
PROJECT CHALLENGES AND OUTCOMES
  • Staging of construction works to minimise disturbance to operational aircraft pavements
  • Investigation into cracking patterns similar to rapid dry shrinkage cracking
  • Review of construction methodology against specification requirements
  • Determination of cosmetic cracking only with no long term durability impacts to the pavement
2011-2012

Brisbane Airport Domestic Apron Construction