East Kimberley Regional Airport, Western Australia, Australia
Projects: Engineering - Planning & Design | Construction | Operations WSO/ARO
PROJECT SUMMARY
Following the successful delivery of Stage 1, ACG Australia was engaged to deliver Stage 2 of the East Kimberley Regional Airport Infrastructure Upgrade, a major expansion project designed to increase airport capacity and support larger commercial aircraft operations.
The project included extending the existing runway from 1,829m to 2,370m, enabling Code 4C aircraft operations and accommodating Boeing 737-800 and Airbus A320-200 aircraft. Works also included upgrades to airfield lighting, drainage infrastructure, pavement markings, perimeter fencing and associated airside infrastructure.
Project Capital Cost: $20m
SCOPE OF WORKS
- Runway extension from 1,829m to 2,370m.
- Earthworks and pavement construction.
- Airfield Ground Lighting (AGL) upgrades and relocations.
- Runway, taxiway and apron line marking.
- Drainage extensions including culverts and open channel systems.
- Construction of new airside perimeter fencing.
- Associated civil works, environmental management and site reinstatement.
- Testing, commissioning and project handover.
PROJECT CHALLENGES AND OUTCOMES
The project was delivered within a live regional airport environment, requiring detailed staging, stakeholder coordination and aviation safety management to minimise operational disruption.
The remote location of Kununurra presented significant logistical challenges, including material procurement, workforce mobilisation and construction sequencing. Through careful planning and integrated project management, ACG successfully delivered the works while maintaining safety, quality and programme objectives.
The completed project significantly enhanced the airport’s operational capability, supporting larger commercial aircraft operations, improving airside safety and increasing long-term capacity for future passenger growth and regional connectivity.
As a result, East Kimberley Regional Airport is better positioned to accommodate future passenger growth, increase airline servicing opportunities and strengthen the region’s connections to key domestic destinations.
KEY DELIVERABLES
- Runway extension to support Code 4C aircraft operations.
- Airfield lighting upgrades and commissioning.
- Runway, taxiway and apron pavement markings.
- Expanded drainage infrastructure and culvert upgrades.
- New airside perimeter fencing.
- Infrastructure designed to accommodate B737-800 and A320-200 aircraft.
- Pavement strength rating of PCN 55/F/D/1448 (210 PSI)/T.
- Enhanced regional aviation capacity, safety and operational resilience.