Dubai International Airport
Projects: Engineering - Planning & Design | Construction | Operations WSO/ARO
PROJECT SUMMARY
ACG was requested to assist with the ARO/WSO role at Dubai International Airport for the SRR works. The works consisted of an Early works package (AGL’s) and the SRR works which consisted of the Southern Runway to be closed for 45days while it was being resurfaced. ACG WSO’s were the main interface between the DXB Duty team and the Contractor covering 7 days per week with 3 Personnel.
Project Capital Cost: 3m DHS
ROLE
WSO/ARO Safety Team
PROJECT CHALLENGES AND OUTCOMES
Dubai International Airport is considered one of the busiest airports in the world, ACG was required to go through extensive training to understand the layout of the airport. Their roles required ACG staff to adapt by understanding the local traditions, languages and political hierarchy within the workforce. ACG has formed a good relationship with the management team of Dubai International Airport and have been recommended to remain after the project has been completed.
ROLES MATRIX
Member: Michael Benzie – WSO
Roles: Work Supervisor, Pavement Inspector, Escorting & Trainer
Member: Shaun Carberry – WSO
Roles: Work Supervisor, Pavement Inspector, Escorting & Trainer
Member: Daniel Jones – WSO
Roles: Work Supervisor & Escorting
Member: Ryan Chisholm – WSO
Roles: Work Supervisor, Pavement Inspector, Escorting & Trainer
2018-Present
Dubai International Airport Southern Runway Resurfacing and AGL Works
References
Steve Adams
Project Manager - Consult Aero
M: +61 439 171 377