RAAF Amberley, Queensland, Australia
Projects: Engineering - Planning & Design | Construction | Operations WSO/ARO
PROJECT SUMMARY
ACG was engaged by the Project Managers responsible for preparing the strategic business case for the provision of base infrastructure upgrades for new aircraft. These included a fleet of Code C – Aleina C27J aircraft, F18G Hornets and C17 aircraft. The works involved assessing the site conditions, determining pavement concept designs for the multiple potential sites on base, preparing cost estimates and working with a team of multi-disciplined consultants. As the new aircraft were replacing an older aircraft, a large component of the works involved assessing the increased requirements of the new aircraft over the replaced aircraft.
PROJECT CHALLENGES AND OUTCOMES
The works involved multiple sites each of which had different infrastructure support requirements such as access to refuelling facilities, minimal infrastructure spend to meet maximum operational flexibility. An in depth understanding of the airfield pavement layout was required to ensure operational requirements would be met and only the necessary areas were nominated for upgrade.
2013
RAAF Amberley Provision of Concept Aircraft Pavement Design
References
David Tranthem
Project Manager – Point Projects
T: +61 (0)7 3119 7500
March 2013 - July 2013
Provision of concept aircraft pavement design
References
David Tranthem
Project Manager – Point Projects
T: +61 (0)7 3119 7500